This was the bedroom before the bathroom. |
And this is the place where the bathroom ended up. |
So we had to move the door over to the right. |
Aaron removed the flooring where the bathroom was going to be. |
And put up the frames for the bathroom. |
Soon-to-be bathroom. :) |
They put up drywall, |
and installed the tub. |
The skeleton of the linen closet. |
Added a door, |
and laid tile on the floors. |
Beadboard on the walls! :) |
Starting to look more like beadboard. I heart beadboard. |
Put grout in the tiles. |
Aaron tried hard to persuade me that we needed a urinal. Ha! |
Installed the toilet & vanity. |
Painted the walls. |
And then we finished up by adding crown molding and hanging the shower curtain. :) |
And putting in the baskets & the finishing touches. |
No comments:
Post a Comment